Success Stories


Moorhead Public Schools, District 152
Moorhead, MN, United States
Schools Schools
Completed: 2013

Moorhead, MN - Moorhead Public School District


This project was a retrofit of four elementary school buildings in the district, ranging from 70,000 sq ft to 104,000 sq ft, with up to two levels each.

The District required universal and remote control over all of their locations, for monitoring and efficiency purposes.
Distech Controls EC-NetAX Web-based building management platform was used to achieve multi-site integration and for the ability to integrate with existing control and terminal equipment, helping the District to respect their retrofit budgets.

BACnet ECB Series controllers and Allure EC-Smart-Vue communicating sensors, delivering increased comfort control and energy efficiency.

The District now has a majority of its schools networked together via EC-NetAX, a single, unified interface and system, for efficiency in operations and monitoring, and additional operational cost savings.

Number of Buildings: 4 Total Area: 384,000

Special Features:
This was a multi-site project, including retrofits of occupied facilities. Project included integration to existing Siemens and Trane proprietary networks.

Products / Equipment Installed: Systems Integrated:
Distech Controls EC-Net-AX Supervisor
Distech Controls EC-BOS
Distech Controls ECB Series Controllers
HVAC

Number of Devices: 200 System Points: 2,000

Controls Contractor: Climate Control

BACnet Manufacturers: Distech Controls, Inc.


Membership Management Software Powered by YourMembership.com®  ::  Legal