Success Stories


The Metropolitan Museum of Art
New York, NY, United States
Other Other
Completed: 2006

New York, NY - The Metropolitan Museum of Art

New York, NY - The Metropolitan Museum of Art

New York, NY - The Metropolitan Museum of Art

The MACH-Global™ controllers installed at the Metropolitan Museum of Art reside on a dedicated Cisco Layer 3 network on copper and fibre optic media which allow for Virtual Private Networking used for remote access to BMS equipment. With the installation of a Reliable Controls® MACH-System, the museum is able to integrate HVAC and lighting control by using Iconics Genesis 32 HMI with BACnet® to OPC servers and integrate with Koyo PLC?s and Staefa System II architecture.

The installation has made real-time system I/O available over a dedicated TCP/IP network. Maintaining temperature and humidity is critical in preserving priceless art collections, conservation areas, and art storerooms.

Number of Buildings: 1 Total Area: 2.5 million

Products / Equipment Installed: Systems Integrated:
1 Reliable Controls ETHER-Link BACnet Building Controller
2 Reliable Controls MACH-Vision Controllers
6 Reliable Controls SMART-Sensors
13 Reliable Controls MACH-Global BACnet Building Controllers
Chiller, HVAC, VAV

Number of Devices: 22 System Points: 700

Controls Contractor: Digital Network Services

BACnet Manufacturers: Reliable Controls, Siemens, Beijer


Membership Management Software Powered by YourMembership.com®  ::  Legal